ELECTRICAL ENERGY FORECASTING - A PROBABILISTIC APPROACH

  • Col Moin Uddin MIST
Keywords: Electrical energy forecasting, Forecasted hourly load, Forecasted annual/seasonal average hourly load, Load ratios, Probability density functions of load ratios, Power system expansion planning.

Abstract

Energy demand forecasting is essentially required for the optimal use of energy resources of a country. This paper
presents a methodology to forecast the electrical energy demand of a power system. The methodology is based on the
forecasting of hourly demand. A relationship is developed among the forecasted annual/seasonal average hourly load
and the probabilistic laws of load ratios to forecast the hourly load. The proposed methodology is validated by
applying it to a power system. The methodology is useful for long term hourly load forecasting and also for the
forecast of electric energy requirement of a country.

Downloads

Download data is not yet available.

References

1. A Keyhani, “Simulation Study for Recursive Prediction of
Hourly Load Demands”, Power Industry Computer Applications
Conf, Toronto, Canada, May 24-27, 1977 (NY: IEEE 1977), pp.
228-236.
2. V.Pansuka, “Short-term Forecasting of Electric Power
System Load from a Weather- Dependent Model”, IFAC
Symposium 1977 on Automatic Control and Protection of
Electric Power Systems Melbourne, Australia, Feb 21 - 25, 1977,
(Sydney, Aust, Instn. Engrs. Australia 1977), pp. 414-418.
3. A.S. Dehdashti, J.R. Tudor, M.C. Smith, “Forecasting of
Hourly Load by Pattern Recognition - a Deterministic
Approach”, IEEE Transactions Vol. PAS - 101, No. 9,
September 1982, pp. 3290-3294.
4. K. Srinivasan and R. Pronovost, “Short-term Load
Forecasting using Multiple Correlation Models”, IEEE
Transactions Vol. PAS-94, No.5, September-October 1975, pp.
3290-3294.
5. P.C. Gupta and K. Yamada, “Adaptive Short- term
Forecasting of Hourly Loads using Weather Information”, IEEE
Transactions Vol. PAS-91, September-October 1972, pp. 2085-
2094.
6. H.S. Hippert, C.E. Pedreira and R.C. Souza,” Neural
Networks for Short -Term Load Forecasting: A Review and
Evaluation”, IEEE Trans. Power Systems, Vol. 16, No 1,
February 2001, pp 44-55.
7. M. A. Jalil and Q. Ahsan, “Impacts of Load Model on the
Generation Expansion Plan of a Utility,” Conference Proceeding
of ICERD-2, November 5-7, 2001, Kuwait.
8. Q. Ahsan and M. A. Jalil , “A New Technique for Forecasting
Hourly Load for Long-Term Planning,” International Journal of
Power and Energy System, Vol-25 No.2, 2005.
9. X. Wang and J.R. McDonald, “Modern Power System
Planning”, Mc.GrawHill International Editions 1994, pp.1 to130.
[10] K.c.Jam and L.N. Aggarwal, “Production Planning Control
and Industrial Management”, Khanna Publishers, Fifth Edition
1990(Forth Reprint 1998) part 3, chapter 3, pp 21 to 60.
[11] Moin Uddin “Development of a Methodology for Long
Term Hourly Electrical Load Forecasting and Assessment of Gas
Requirement”, M. Sc. Engineering Thesis, Department of EEE,
BUET, Dhaka, August 2003.
Published
2019-11-28
How to Cite
Col Moin Uddin. (2019). ELECTRICAL ENERGY FORECASTING - A PROBABILISTIC APPROACH. MIST INTERNATIONAL JOURNAL OF SCIENCE AND TECHNOLOGY, 2(1). https://doi.org/10.47981/j.mijst.02(01)2010.70(%p)